To control cost
(and almost anything else)
think inside the box
Single Shot/Recycle: (ProgramaCube® Function SRE)
OPERATION: Upon application of input voltage and the closure of S1, TD1 begins. At the same time, the TD2 ON time begins and the output (relay or solid state) energizes. Upon completion of the ON time, the output de-energizes for the TD2 OFF time. At the end of the OFF time, the equal ON/OFF cycle repeats. TD1 and TD2 run concurrently until the completion of TD1 at which time, the TD2 ON/OFF cycle terminates and the output de-energizes. Opening or reclosing S1 during timing has no affect on the time delays. The output will energize if S1 is closed when input voltage is applied.
RESET: Removing input voltage resets the time delay, output, and the sequence to the first delay.
Function can be applied to these Series:
(Click to View Data Sheet)HRPD, KRPD, KSPD, NHPD
Single Shot / Recycle
V = Voltage    NO = Normally Open Contact    R = Reset 
   NC = Normally Closed Contact    TD1, TD2 = Time Delay   
    S1 = Initiate Switch   
ABB SSAC Sitemap
Contact Us, Launch Email
ABB SSAC Home
Search by Part Number

Low Voltage Products & Systems

© Copyright 2002 ABB.
All rights reserved.
Revised 3/28/06