To control cost
(and almost anything else)
think inside the box
Recycling: (ProgramaCube® Functions RE, RD, RXE, RXD)
(Flasher, Pulse Generator, Recycle Timing, Repeat Cycle, Duty Cycling)
OPERATION: Upon application of input voltage, the output (relay or solid state) energizes and the OFF time begins. At the end of the OFF time, the output de-energizes and the ON time begins. At the end of the ON time, the output energizes and the cycle repeats as long as input voltage is applied. The ON time may be the first delay in some recycling timers.
RESET: Removing input voltage resets the output and time delays, and returns the sequence to the first delay.
The time delays in some recycling timers are equal TD1=TD2. Flashers are an example of this type of recycling timer. Others have separately selectable time delays.
Function can be applied to these Series:(Click to View Data Sheet) HRPS ,HRPU KRPS, KSPS, KSPU, NHPS, NHPU,
                    Recycle (OFF First)
V = Voltage    R = Reset    NO = Normally Open Contact   
NC = Normally Closed Contact    
TD, TD1, TD2 = Time Delay  
ABB SSAC Sitemap
ABB SSAC Home
Search by Part Number
SSAC Timers and Controls

© Copyright 2002-2010 SSAC LLC.
All rights reserved.
Revised 5/01/06