| |
To
control cost (and almost anything else) think inside the box |
| Interval/Recycle: (ProgramaCube® Function IRE)
OPERATION: Upon application of input
voltage TD1 begins. At the same time, the TD2 ON time begins and the
output (relay or solid state) energizes. At the end of the ON time,
the TD2 OFF time begins and the output de-energizes. The equal ON time
OFF time cycle continues until TD1 is completed at which time the output
de-energizes. RESET: Removing input voltage resets the time delays, output, and the sequence to the Interval function. Function can be applied to these Series: (Click to View Data Sheet) KSPD, KRPD, NHPD, HRPD, |
![]() |
|
V = Voltage NO = Normally
Open Contact R = Reset NC = Normally Closed Contact TD1, TD2 = Time Delay |
Low Voltage Products & Systems
© Copyright 2002 ABB.
All rights reserved.
Revised 3/28/06