To control cost
(and almost anything else)
think inside the box
Interval/Delay On Make: (ProgramaCube® Function IM)
OPERATION: Upon application of input voltage, the output (relay or solid state) energizes and TD1 begins. At the end of TD1, the output de-energizes and TD2 begins. At the end of TD2, the output energizes.
RESET: Removing input voltage resets the time delays, output, and the sequence to the first delay.
Function can be applied to these Series:
(Click to View Data Sheet) HRPD, KRPD, KSPD, NHPD
Interval / Delay on Make
V = Voltage    NO = Normally Open Contact    R = Reset 
   NC = Normally Closed Contact    TD1, TD2 = Time Delay   
   
ABB SSAC Sitemap
Contact Us, Launch Email
ABB SSAC Home
Search by Part Number

Low Voltage Products & Systems

© Copyright 2002 ABB.
All rights reserved.
Revised 3/28/06