To control cost
(and almost anything else)
think inside the box
Delay on Break: (ProgramaCube® Function B)
OPERATION: Input voltage must be applied before and during timing. Upon closure of the initiate switch, the output (relay or solid state) energizes. The time delay begins when the initiate switch is opened. The output remains energized during timing. At the end of the time delay, the output de-energizes. The output will energize if the initiate switch is closed when input voltage is applied.
RESET: Reclosing the initiate switch during timing resets the time delay. Removing input voltage resets the time delay and output.
Function can be applied to these Series:(Click to View Data Sheet) HRPS, HRPU, KRPS, KSPS, KSPU, NHPS, NHPU,
Delay on Break (OFF-delay)
V = Voltage    NO = Normally Open Contact    R = Reset 
   NC = Normally Closed Contact    TD = Time Delay   
S1 = Initiate Switch   
= Undefined time
ABB SSAC Sitemap
Contact Us, Launch Email
ABB SSAC Home
Search by Part Number

Low Voltage Products & Systems

© Copyright 2002 ABB.
All rights reserved.
Revised 3/28/06