| |
To
control cost (and almost anything else) think inside the box |
| Accumulative Delay on Make/Interval: (ProgramaCube®
Function AMI)
OPERATION: Input voltage must be
applied before and during timing. The output is de-energized before
and during the TD1 time delay. Each time S1 closes, the time delay progresses;
when it opens, timing stops. When the amount of time S1 is closed equals
the full TD1 delay, the output (relay or solid state) energizes for
TD2. Upon completion of TD2, the output relay de-energizes. Opening
S1 during TD2 has no affect. RESET: Removing input voltage resets the time delay, output relay, and the sequence to the first delay. Function can be applied to these Series:(Click to View Data Sheet) HRPD, KRPD, KSPD, NHPD |
Accumulative Delay on Make/ Interval
|
|
V = Voltage NO = Normally
Open Contact R = Reset NC = Normally Closed Contact TD1, TD2 = Time Delay S1 = Initiate Switch |
Low Voltage Products & Systems
© Copyright 2002 ABB.
All rights reserved.
Revised 3/28/06