|
RECYCLING
(Recycle Timing, Repeat Cycle, Duty Cycling)
- OPERATION/TIME DIAGRAM (ON TIME FIRST)
OPERATION: Upon application of power,
the output is energized (relay is transferred) and the ON time begins.
At the end of the ON time, the output de-energizes and the OFF time
begins. At the end of the OFF time, the output is energized and the
cycle repeats as long as power is applied. The OFF time may be the
first delay in some recycling timers.
RESET: Removing power resets the output and time delays, and returns
the sequence to the first delay.
-
|