ABB SSAC Sitemap
Contact Us, Launch Email
ABB SSAC Home
Search by Part Number


Low Voltage Products & Systems

INTERVAL
(On Interval, Interval On, Pulse Shaping, Bypass Timing)

OPERATION/TIME DIAGRAM

OPERATION:
Upon application of power, the time delay begins. The output is energized (relay is transferred) during the time delay. At the end of time delay, the output is de-energized and remains de-energized until power is removed.

RESET: Removing power resets the time delay and the output.

© Copyright 2002 ABB. All rights reserved.
Revised 01/17/08