ABB SSAC Sitemap
Contact Us, Launch Email
ABB SSAC Home
Search by Part Number


Low Voltage Products & Systems

DELAY ON MAKE
(On Delay, Delay on Operate, Operate Delay, Prepurge Delay)

OPERATION/TIME DIAGRAM

OPERATION:
Upon application of power, the time delay begins. The output is de- energized before and during the time delay. At the end of the time delay, the output is energized (relay is transferred) and remains energized until power is removed.

RESET: Removing power resets the time delay and output.

© Copyright 2002 ABB. All rights reserved.
Revised 01/17/08