| |
To
control cost (and almost anything else) think inside the box |
| Inverted Delay on Break: (ProgramaCube® Function UB) OPERATION: Input voltage
must be applied before and during timing. Upon closure of the initiate
switch S1, the output (relay or solid state) de-energizes. The time
delay begins when S1 is opened. The output remains de-energized during
timing. At the end of the time delay, the output energizes. The output
remains de-energized if S1 is closed when input voltage is applied. RESET: Reclosing S1 during timing resets the time delay. Removing input voltage resets the time delay and output. Function can be applied to these Series:(Click to View Data Sheet) HRPS, HRPU, KRPS, KSPS, KSPU, NHPS, NHPU, |
Inverted Delay on Break
|
|
V = Voltage NO = Normally
Open Contact R = Reset NC = Normally Closed Contact TD = Time Delay S1 = Initiate Switch |
© Copyright 2002-2010 SSAC LLC.
All rights reserved.
Revised 3/28/06