To control cost
(and almost anything else)
think inside the box
Interval/Recycle: (ProgramaCube® Function IRE)
OPERATION: Upon application of input voltage TD1 begins. At the same time, the TD2 ON time begins and the output (relay or solid state) energizes. At the end of the ON time, the TD2 OFF time begins and the output de-energizes. The equal ON time OFF time cycle continues until TD1 is completed at which time the output de-energizes.
RESET: Removing input voltage resets the time delays, output, and the sequence to the Interval function.
Function can be applied to these Series:
(Click to View Data Sheet) KSPD, KRPD, NHPD, HRPD,
V = Voltage    NO = Normally Open Contact    R = Reset 
   NC = Normally Closed Contact    TD1, TD2 = Time Delay   
   
ABB SSAC Sitemap
ABB SSAC Home
Search by Part Number
SSAC Timers and Controls

© Copyright 2002-2010 SSAC LLC.
All rights reserved.
Revised 3/28/06